
Approx. 70 to 90 minutes to the downtown core, traffic dependent
Crane and heavy haul in Vancouver.
Vancouver lifts are won or lost on the setup plan: lane closures, overhead trolley wires, height limits and a window that does not move.
Where we work
Areas and landmarks we run to
- Downtown peninsula, Coal Harbour and the West End tower corridors
- Mount Pleasant and the False Creek Flats industrial blocks
- Marine Drive and Fraser River industrial waterfront
- Broadway corridor construction and transit-adjacent sites
Typical work
Project types in Vancouver
- Rooftop HVAC, boiler and generator placement on commercial buildings
- Material hoisting for high-density residential and tower fit-outs
- Glazing, steel and prefabricated assemblies into constrained sites
- Night and weekend lifts under city permit and traffic control
Local notes
- City street occupancy permits and traffic control plans usually need several days, so call as soon as the date is set.
- Send curb-to-target distance and any wires overhead; that decides whether one unit or a tandem lift is the safe call.
Drive time: Approx. 70 to 90 minutes to the downtown core, traffic dependent
Get a quote
Call dispatch · (604) 621-4090