CraneX operator placing structural steel on a Sea to Sky corridor construction site
Approx. 2 hours via Highway 1 and the Sea to Sky Highway

Crane and heavy haul in Squamish.

Sea to Sky work is planned work: one run up, a full day on site and a route with real grade and clearance limits.

Where we work

Areas and landmarks we run to

  • Downtown Squamish and the Oceanfront development lands
  • Squamish Business Park and Queens Way industrial blocks
  • Sea to Sky Highway 99 corridor and Britannia Beach
  • Garibaldi Highlands and Brackendale residential areas
Typical work

Project types in Squamish

  • Structural steel, trusses and prefabricated assemblies for corridor builds
  • Utility, telecom and hydro equipment placement
  • Modular building and site office setting on remote lots
  • Equipment delivery and recovery on grade-limited access roads

Local notes

  • Highway 99 grades and clearance limits shape what we can bring, so send dimensions and weight before we book the day.
  • Corridor trips are usually scheduled as a full day rather than a short call-out.

Drive time: Approx. 2 hours via Highway 1 and the Sea to Sky Highway

Get a quote

Working in Squamish?

Call dispatch · (604) 621-4090

Requests go straight to our dispatch pipeline. We usually reply the same business day.