
Approx. 50 to 70 minutes west via Highway 1 or Highway 7
Crane and heavy haul in Coquitlam.
Coquitlam runs from flat Mayfair industrial to steep Burke Mountain builds, and the two need very different setups.
Where we work
Areas and landmarks we run to
- Mayfair and United Boulevard industrial blocks
- Burke Mountain and Partington Creek residential development
- Port Coquitlam Dominion and Kingsway industrial areas
- Port Moody waterfront and Ioco corridor
Typical work
Project types in Coquitlam
- Truss, beam and material lifts over finished homes on steep lots
- Hot tub, spa and modular unit placement in back yards
- Light industrial equipment and machinery moving
- Utility, culvert and precast structure setting for municipal work
Local notes
- Burke Mountain grades and narrow streets decide the setup, so a photo of the street approach saves a wasted trip.
- Highway 7 is often the faster route from Abbotsford in the morning peak.
Drive time: Approx. 50 to 70 minutes west via Highway 1 or Highway 7
Get a quote
Call dispatch · (604) 621-4090