
Approx. 50 to 70 minutes west via Highway 1 and Highway 91
Crane and heavy haul in Delta.
Delta work is port and terminal work, where gate windows, weight limits and paperwork decide the schedule.
Where we work
Areas and landmarks we run to
- Annacis Island and Tilbury industrial parks
- Deltaport and Roberts Bank terminal approaches
- Ladner and Tsawwassen commercial areas
- Highway 17 and Highway 91 freight corridors
Typical work
Project types in Delta
- Terminal and yard equipment moves with restricted access windows
- Heavy machinery and fabricated assemblies onto lowbed configurations
- Industrial plant maintenance lifts in Tilbury and Annacis
- Oversize and overweight hauls with permits and escorts arranged
Local notes
- Port and terminal sites need gate passes and safety orientation, so give dispatch the site requirements up front.
- The Massey tunnel restricts height and dangerous goods; we route around it when the load calls for it.
Drive time: Approx. 50 to 70 minutes west via Highway 1 and Highway 91
Get a quote
Call dispatch · (604) 621-4090